BESS & the New Grid Connections Model: From “Ready” to “Needed”
BESS & the New Grid Connections Model: From “Ready” to “Needed” takes place on Mon, 12 Oct 2026 at 15:00 (GMT+1) at Riverbank House in London, United Kingdom, and runs until 19:30. Entry is free; the listing is on Luma.
About this event
Join industry leaders at the EnergyPro & Fieldfisher forum to discuss the challenges and opportunities in Battery Energy Storage Systems (BESS) projects. Featured speakers include Adam Terry, Davide Cabrini, and Richard Power, followed by a panel Q&A and networking session.
Full description from organizerShow less
With NESO's shift to a "ready and needed" grid connections model, projects must now meet both the Gate 2 readiness criteria (secured land or planning consent) and alignment with the Clean Power 2030 capacity targets. As a result, BESS projects will need to be not just ready, but also strategically positioned to secure a queue place. We are delighted to invite you to a joint EnergyPro & Fieldfisher industry forum bringing together industry leaders to explore the challenges and opportunities shaping BESS projects today. Highlights will include: Adam Terry (Harmattan Renewables) on identifying the right location, size and battery duration for the next phase of BESS projects Davide Cabrini (Opoura/Novogrid) on how Battery Storage projects should navigate the new grid queue Jonny Riggall (Blue Dot Energy & Environment) on effectively managing the sustainability requirements of battery storage developments. Richard Power (Fieldfisher) on the potential increase in litigation risk linked to grid connection Charlie von Schmieder (Gresham House) on the developer's perspective A panel Q&A closing out the day Agenda 3:00pm Assemble 3:15pm Welcome address 3:30pm Sessions Adam Terry, from Harmattan Renewables Location, Size, Duration for the next phase of BESS projects Davide Cabrini, from Opoura/Novogrid Battery Storage, Gate 2, and Grid in the UK Richard Power, from Fieldfisher Potential Increase in Litigation Risk Linked to Grid Connection Jonny Riggall, from Blue Dot Energy & Environment Battery Storage Sustainability Requirements Charlie von Schmieder, from Gresham House Developer's Perspective 4:30pm Panel Q&A with speakers 5:30pm Wrap-up 5:30pm – 7:30pm Networking (food and drink) If you have any questions, reach out to us at [email protected].
Keep going
All London events →Similar events
View all →







Details
- When
- Mon, 12 Oct 2026 · 15:00 (GMT+1) · until 19:30
- Where
- Riverbank House
- Address
- Riverbank House, 2 Swan Ln, London EC4R 3TN, UK
- Price
- Free
- Genre
- climate
- Weather
- 14°C · DrizzleForecast at 15:00 (GMT+1)
Questions
- When is BESS & the New Grid Connections Model: From “Ready” to “Needed”?
- Mon, 12 Oct 2026 at 15:00 GMT+1.
- How much are tickets for BESS & the New Grid Connections Model: From “Ready” to “Needed”?
- Entry is free.
- Where is BESS & the New Grid Connections Model: From “Ready” to “Needed”?
- Riverbank House, Riverbank House, 2 Swan Ln, London EC4R 3TN, UK, London, United Kingdom.
- Where can I buy tickets for BESS & the New Grid Connections Model: From “Ready” to “Needed”?
- Tickets are sold on Luma. This page links straight to that listing; no tickets are sold here.
- What time does BESS & the New Grid Connections Model: From “Ready” to “Needed” end?
- It runs until 19:30.
